|
keatingofchicago.com
6
(See lighting instructions plate attached to the inner
door of Keating Gas Fryer.) Model AA does not require
an electrical connection.
Make sure that the Keating Gas Fryer is plugged in.
If not your fryer will not operate. Make sure that the
main gas valve on the gas supply line to the Keating
Gas Fryer is in the “ON” position.
AIR IN THE GAS SUPPLY LINE MAY REQUIRE A LONGER
THAN NORMAL PERIOD OF TIME TO LIGHT YOUR
FRYER DURING INITIAL INSTALLATION OR AFTER
OVERNIGHT SHUTDOWN.
NOTE:
Unless you have an AA model your fryer cannot
be operated during a power failure.
AA MODELS OPERATING INSTRUCTIONS
DO NOT START FRYER WITHOUT FIRST FILLING FRY
POT.
START-UP PROCEDURE
1. Set thermostat to the “OFF” position.
2. Turn “MAIN POWER” switch to the “OFF” position.
3. Turn gas valve knob to “PILOT” position.
4. Light constant pilot located on left side of
pilot runner tube.
5. Push and hold the gas valve knob for 30 seconds
and release.
6. With the pilot still on, turn gas valve knob to the
"ON" position.
7. Set thermostat to desired temperature, turn
“MAIN POWER” switch to the “ON” position.
The burners will come on.
SHUTDOWN PROCEDURE
1. Set thermostat to the “OFF” position.
2. Turn “MAIN POWER” switch to the “OFF” position.
3. Turn gas valve knob to the “OFF” position.
4. Turn gas supply valve to the “OFF” position.
5. Check to make sure all burners and pilot are
extinguished.
SERIES 2000 BB MODELS
OPERATING INSTRUCTIONS
DO NOT START FRYER WITHOUT FIRST FILLING FRY
POT.
START-UP PROCEDURE
1. Set “MELT-IDLE-FRY” switch to “IDLE” position
and thermostat to the “OFF” position.
2. Turn “MAIN POWER” switch to the “ON" position.
3. Light constant pilot located on left side of pilot
runner tube.
4. Hold the “PUSH TO LIGHT” switch in until the
amber “PILOT ON” light comes on.
5. Set thermostat to desired temperature.
6. Set “MELT-IDLE-FRY” switch to “FRY.” The burners
will come on. Select “MELT” with solid shortening
until liquid shortening is 1" from full, then switch
to the “FRY” position after packing shortening
around burner tubes.
SHUTDOWN PROCEDURE
1. Set “MELT-IDLE-FRY” switch to “IDLE” position
and thermostat to the “OFF” position.
2. Turn “MAIN POWER” switch to the “OFF” position.
Its green light will go off.
3. Check to make sure all burners and pilot are
extinguished.
AA CONTROL PANEL - SERIES 2000
AA CONTROL PANEL - SERIES 2006
AA CONTROL PANEL - SERIES 2010
BB CONTROL PANEL – SERIES 2000