14
| Kaye LTR-150 - Dry Block & Liquid Bath All-in-One Temperature Calibrator
4.3 Connect to Main Power
Ensure the following before powering up the LTR-150:
• Ensure supply voltage is from 100- 240 VAC 50/60 Hz.
• Connect the LTR-150 only to a properly installed and grounded, three-pronged outlet.
• Do not use any extension cables or adapter plugs.
• Use only the original power cables supplied by Kaye or approved, like power cable.
IMPORTANT! “KILL” switch!
The plug of the mains connecting cable serves as a “KILL” switch.
• Ensure that the plug is always easily accessible and easy to reach.
• In an emergency, pull the plug, so that the machine is isolated from the mains.
4.4 LTR-150 Startup
Prior to powering up the LTR-150 perform the following tasks;
• Unscrew the Insert Transport Cover exposing the Dry Block Insert.
• Connect the External Reference Probe to the connector marked “ext Ref” on the front panel
and insert into the dry block using one of the 2 holes sized specifically for the Reference Control
Probe.
Power On the LTR-150 by utilizing the Power Switch on the front panel
Once powered on, the Kaye LTR-150 splash screen will appear for approximately thirty seconds followed
briefly by the model and firmware version before presenting the
Remote Control
home screen.
Chapter 4. Getting Started
Summary of Contents for LTR-150
Page 43: ...43 M5101 EN Rev B Notes...