14
936.2332
/E
/0905
/1
4.1
6
e
Submenu cable NIT
The following error messages are possible :
For system planning, the following must be observed (Plugging prescription) :
In order to establish a cable NIT, it is necessary that each satellite level is reached by at least one TP channel unit.
Examples :
a)
Set-up with only one input splitter array
b)
Two polarisations
e. g. Astra V
e. g. Astra H
e. g. Astra H
e. g. Eutels. H
e. g. Eutels. V
e. g. Astra V
e. g. Astra H
c)
Two input splitter arrays, several polarisations (with option UFS 340).
The cable NIT can only be
established for transponders
equipped with a TP channel unit.
NIT error:
Plugging sequence
was not observed
< Continue:
key >
e.
g.
UFO
386/TP
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g.. UFO
390
e.
g. UFO
390
e.
g.. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g.
UFO
386/TP
e.
g.
UFO
386/TP
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g.
UFO
386/TP
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
e.
g. UFO
390
Towards inputs A
Towards inputs A
Towards inputs A
Towards inputs B
Towards inputs B
Towards inputs B
A
B
B
B
B
A
B
A
NIT error:
Not all channel units
are locked in place
< Continue:
key >