Initial commissioning
7.1
Performing initial commissioning
After installing and switching on the inverter, the dialogue for initial commissioning starts
automatically. During initial commissioning, the user is guided via a checklist on the dis-
play.
If the initial commissioning is not completed, the dialogue for initial commissioning will start
again after switching on the inverter.
Not until all the checkboxes in the checklist have been marked and the "Fin-
ish" menu is closed, will the initial commissioning be concluded.
During initial commissioning, the operator is guided through the menus "Display language",
"Date", "Time", "Country", and "Reactive power characteristic curve" (only when prescribed
for the selected country).
The settings in the menus of the initial commissioning are performed via the operating but-
tons (for a comprehensive description of the function of the operating buttons, refer to
chapter 8).
7.2
Finishing the initial commissioning
By selecting "Finish" in the checklist, the successful completion of the initial commissioning
is confirmed. If any settings have not been processed completely,the message "Settings
are incomplete" appears. In this case:
1. Press "SET". The checklist is displayed again.
2. Process the open items and finish the processing.
When all settings have been processed, a dialogue stating "Are all settings correct?" is dis-
played. In this case:
1. If any settings have to be corrected, select the corresponding menu in the checklist
and correct the settings.
2. If all the settings are correct: press "SET" longer. The inverter is restarted and syn-
chronises itself with the grid.
After finishing the initial commissioning, you can set the feed-in management and switch
DC on (refer to section 7.4).
For any information on particular settings (e.g. incorrect entries or missing
countries in the country setting) refer to the document "Technical Information"
in the download area on the Steca website.