17
4
PREPARATION BEFORE OPERATION
4.1
Cleaning
Unpainted and uncoated machine surfaces were coated with a rust inhibitor prior to
shipment. The rust inhibitor should be cleaned with an appropriate solvent. To prevent
rust on unpainted surfaces, a light coat of machine oil can be applied.
4.2
Lubricating
Lubricate all the sliding parts before starting.
4.3
Coolant
The machine is shipped with the coolant reservoir empty. Fill the reservoir with coolant
until it is full.
Caution:
Do not run the coolant pump without coolant in the reservoir. Otherwise, the
coolant pump will be damaged.
4.4
Electrical Power Connection
1.
Electrical connection must be done by a qualified electrician, in conformance with the
required electrical standards of your area.
2.
Turn off the main circuit breaker of the area in which the machine will be located.
3.
Machine's power cord should be connected to an appropriate power source; make sure the
voltage rate matches the one required for the machine.
4.
It is important that the shipping brace should be removed from the saw before taking any
further step.
Note
: If the ‘emergency stop button’ is depressed, it must be released for the machine to run.
4.5
Final Inspection Checklist before Operation
After installing the machine, a final inspection should be performed by considering the
following checklist;
Any missing components, guards or panels
Lost fasteners and fittings, hoses and conduit
Missing or damaged items
Coolant, oil, or hydraulic leads
Tools and others materials left on saw
Safety measures, general condition and readiness for use
Summary of Contents for KMT 180 CRAFT
Page 9: ...9 1 2 Danger Zones on the Machine...
Page 10: ...10 1 3 Safety Equipments On The Machine...
Page 14: ...14 2 4 Machine Dimensions...
Page 27: ...27 9 SPARE PART LIST...
Page 33: ...33 9 3 VISE ASSEMBLY...
Page 35: ...35 9 4 BOW ASSEMBLY...
Page 45: ...45 9 11 ELECTRIC GROUP...
Page 46: ...46...
Page 47: ...47...