New Unit Information 05.2007
Puzzi 8/1 C
Basic settings and service procedures
Page 19 / 29
1 Air discharge, motor cooling air
2 Sound insulation
3 Holder, suction motor
4 Cover, suction motor (air circuit)
5 Suction motor (M1)
6 Printed circuit board (N1)
7 Air duct, drawn in air from floor tool
8 Air intake opening with fluff strainer
9 Fresh-water hose to the spray/ suction
hose
10 Hose clamp
11 Water pump (M2)
12 Water hose from fresh-water tank
13 Retaining screws (4x), suction motor
cover
Remove floor cover
– Remove retaining screws (see Page 9,
Item 8).
– Remove floor cover.
Remove suction motor cover
– Remove retaining screws (13).
– Remove suction motor cover.
Floor cover removed
1
2
4
7
8
3
6
11
10
1
9
12
5
13