Tower removal process
Removal of the tower allows access to the solution tank cover/gasket, the strainer assembly and outlet hose from the tank to the
strainer. The Steering shaft removal process needs to be performed in order to remove the tower assembly (see instructions on
pages 23-28.
Using the T-20 Torx driver remove the 5 screws towards
the front of the tower.
Lay the machine on it’s side and remove the 10
screws from the bottom of the tank.
Remove the 4 screws holding the axel/
wheel assembly.
Remove the screws from the wheel wells (2 on each side).
Summary of Contents for ARMADA BRC 40/22 C
Page 1: ...1 ARMADA BRC 40 22 C...
Page 5: ...5 Technical Specifications...
Page 6: ...6 Product Overview...
Page 7: ...7...
Page 38: ...38 Electrical schematic...
Page 39: ...39 Wire color code...
Page 43: ...43 Solution system flow...
Page 52: ...52 Figure 1g Figure 2g...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 61: ...61 New material to strengthen the vac shoe mount...