4. Allow clearance above so that the AIS SART can be easily removed from the
bulkhead bracket.
Mounting procedure
Fix the mounting bracket to the ships wall using marine grade stainless steel
screws or bolts; length is dependent upon application. Bolts should be secured
with either stainless steel locking nuts or stainless-steel nuts with stainless
steel shake proof washers.
The wall bracket is designed to mount on a flat surface using two fixing points.
Two stainless steel screws 20mm in length are included. Check that the rear
side of the mounting surface is clear and that the fixing screws will not
penetrate something they should not. Offer the bracket into the chosen
position and mark through the mounting slots using the bracket as a template.
Drop the AIS SART carry bag rear pockets over the bracket hook section and
push the bag firmly into place.
Figure 4 Wall mounting bracket
Summary of Contents for SafeLink AIS SART2
Page 6: ......
Page 25: ...9 DIMENSIONAL DRAWINGS NOTE All dimensions are in millimeters 9 1 AIS SART main unit...
Page 26: ...9 2 Pole...
Page 27: ...9 3 Bag...
Page 28: ...9 4 Wall mounted bracket...
Page 32: ...NOTE...
Page 33: ...NOTE...