3 INSTALLATION
3.1 Items in the Package
The AIS SART is typically delivered with standard package as listed in Table 1
and illustrated in Figure 3.
Table 1 Standard equipment list
Item N°
Designation
Quantity
1
AIS SART
1
2
Carry bag
1
3
1 m extension Pole
1
4
Wall mounted bracket
1
5
10 m buoyant lanyard
1
6
Screw M4x20
2
-
User manual (not shown)
1
Figure 3 Standard Package
3.2 Wall bracket installation
When selecting a suitable mounting position consider the following points:
1. Ease of access in an emergency, adjacent to the ship’s bridge wing exits
ready for easy access is recommended.
2. Position at least 1m from compass equipment.
3. Environmental protection, chose a protected location away from the extreme
effects of the weather and protected from powerful vessel wash down hoses.
Summary of Contents for SafeLink AIS SART2
Page 6: ......
Page 25: ...9 DIMENSIONAL DRAWINGS NOTE All dimensions are in millimeters 9 1 AIS SART main unit...
Page 26: ...9 2 Pole...
Page 27: ...9 3 Bag...
Page 28: ...9 4 Wall mounted bracket...
Page 32: ...NOTE...
Page 33: ...NOTE...