Venkon XL UL
Assembly, installation and operating instructions
45
9.2
Maintenance Schedule:
The sections below describe maintenance work needed for the proper and trouble-free operation of the equipment.
If there are signs of increased wear during regular checks, shorten the required maintenance intervals to the actual wear and
teat. Contact the manufacturer with any questions about maintenance work and intervals.
Interval
Maintenance task
Personnel
As required
Regular visual checks and acoustic checks for
damage, dirt and function.
User
quarterly
Check filter for dirt, clean and change filter when
needed.
User
every six months
Clean unit components (heat exchanger, con-
densate tray, condensate pump, float switch).
User
every six months
Check water-side connections, valves and fit-
tings for dirt, leak-tightness and function.
User
every six months
Check the electrical wiring.
Qualified personnel
every six months
Clean components/surfaces that come into con-
tact with air.
Qualified personnel
quarterly
Check the heat exchanger for dirt, damage, cor-
rosion and leak-tightness. Carefully vacuum the
heat exchanger if dirty.
User
quarterly
Check the condensation tray, float switch and
drain connection for dirt, damage and leak-tight-
ness. Remove any condensation deposits that
have accumulated.
User
Summary of Contents for Venkon XL UL
Page 2: ......