29
KaCool D
02.02.2017
Installation and Connection
Hanging the unit
Hanging the unit
The ceiling needs to be opened accordingly after selecting
the installation site. With a ceiling construction with insert
panels, remove these over a wide area around the cassette.
With a
fi
xed plasterboard ceiling, create an appropriate cut-out
based on the dimensions shown opposite. In addition, create
the inspection openings according to the illustration shown
opposite.
Now drill holes in the bare concrete ceiling for the rawlplugs
for
fi
xing the unit. Then attach the rawlplugs and, for example,
the threaded rods.
Fix the mounting brackets (supplied with the delivery) for
the ceiling cassette at an appropriate height. The mounting
brackets rest on a rubber pad to prevent vibrations and are
fi
xed with washers and nuts.
The ceiling cassette can now be guided into the ceiling
construction with the aid of two people or an appropriate
lifting aid and hung in the
fi
rst two mounting brackets. Then
fi
x the other two mounting brackets to the ceiling cassette.
Now secure the brackets with the enclosed screws. The water,
condensation and electrical connections can now be made.
Ceiling cut-out
Model
1–3
Model
4–6
A
mm
600
870
B
mm
600
870