4
OODMANUAL 0720
KAM CONTROLS, INC.
P
The KAM OOD can be installed directly in main
lines with a pipe diameter of 4" and greater.
FIG. 3-1.
On applications where the pipe diameter is less
than 4” the instrument must be installed on a
"T" or analyzer loop with a minimum distance of
6” before any bends, reducers, elbows, valves,
etc. FIG. 3-2.
PLEASE NOTE: In all KAM OOD installations,
the user should ensure that the KAM OOD
is installed in a turbulent flow per KAM
recommendations.
4" minimum
pipe diameter
3 I N S TA L L AT I O N
FIG. 3-1
FIG. 3-2
INSTALLATION FLOW AND LOCATION REQUIREMENTS
6" minimum
FLOW
FLOW