background image

 

- 16 - 

 

 

 

 

- 17 - 

KALVIS - 2-30U,    -2-40U       2012.02.06

 

 

 

If boiler operates at the power less than the nominal power specified in the 

technical  specifications,  efficiency  of  the  boiler  reduces,  environmental 
indices become worse. Therefore it is recommended to use boiler connection 
diagrams with accumulation capacities (

see fig. 4c, 4d

). Minimum volume of 

accumulation capacity is calculated according to the formula given at 

fig.

 

4d

6.4. Burning chamber assembly 

Boilers  are  supplied  fully  assembled,  but  after  completion  of  all  boiler 

installation works it is necessary to check whether heat-proof concrete bricks 
are put in correctly (

18

) (

see. fig.1

) in the burning chamber (

13

). If bricks are 

out of their original positions, return them back to correct places. If the bricks 
are supplied separately or if you want to replace the worn bricks, do this in the 
following sequence: 

Through  front  door  (

22

  and 

24

)  into  secondary  combustion  chamber  (

13

insert the side and the central bricks (

D

) (

see fig.5

). Place rear bricks (

C

) and 

bottom bricks (

B

) into  the spaces.  Lastly,  put  frontal bricks 

(A)

 onto the side 

and  the  central  brick  edges  (recess  down,  towards  inside  of  combustion 
chamber).  

 

 

Fig. 5 

Firestone brick combustion chamber construction. 

6.5. Inserting the draught regulator 

Attention!

    Draught  adjuster  (28)  (see  fig.1)  is  supplied  screwed  into  the 

boiler but not sealed.

  

Draught regulator (

hereinafter referred to as  regulator

) is  screwed in, for 

sealing  using  oakum  or  sealing  tape.  Connect  the  chain  with  primary  air 
supply valves (

24

) (

see also chapter 7.3

). 

6.6. Connection of cooling system for boiler 

According to the requirements of LST EN 303-5 standard par. 4.1.5.11.3, 

for  boiler  operation  it  is  necessary  to  install  the  devices  used  for 
dissemination of heat excess, is for some reasons normal heat take-away is 

Example

Summary of Contents for Kalvis-2-30U

Page 1: ...ick product barcode here CENTRAL HEATING SOLID FUEL BOILER KALVIS 2 30 U KALVIS 2 40 U TECHNICAL CERTIFICATE INSTALLATION AND MAINTENANCE MANUAL ST 144948958 13 2011 LST EN 303 5 20548 87 20548 93 Exa...

Page 2: ...ng system and chimney I have the following claims 1 Thinking that this happened due to defects of the boiler I ask you to send your representatives for checking the installed boiler finding and elimin...

Page 3: ...ng system 12 6 4 Burning chamber assembly 17 6 5 Draught regulator insertion 17 6 6 Connection of boiler cooling system 17 6 7 Requirements for electric part installation 19 6 8 Exhauster connection o...

Page 4: ...boiler it will cause no troubles in handling and serve you reliably safely for a long time We wish you a warm and comfortable life 29 KALVIS 2 30U 2 40U 2012 02 06 REPORT ON BOILER INSTALLATION Boiler...

Page 5: ...h 4 way mixing valve or thermostatic 3 way valve in order to ensure temperature that the water returning to the boiler was of no lower than 60 C Attention If you fail to meet this requirement corrosio...

Page 6: ...0 1260 1300 1540 1700 815 900 1260 1300 Mass no more than net gross kg 364 385 473 494 Firing with 18 20 damp birch firewood It is not recommended to fire with firewood damper than 30 For boilers with...

Page 7: ...Fig 1 1 Boiler body 2 Upper loading cover 3 Electric heating element installation place 4 Cooling coil installation place 5 Service cover 6 Firing valve 7 Upper decorative cover 8 Hot water branch 9 F...

Page 8: ...s are stored and transported fastened onto wooden pallet and twisted with polythene film of nothing else is agreed in the supply agreement see fig 2a Boilers are allowed to transport exclusively in ve...

Page 9: ...vents the system from exceeding pressure by more than 0 15 MPa 1 5 kgf cm2 To close supply or return water line valves when boiler is in operation To dry fuel or other easily combustible materials nea...

Page 10: ...cessary to know that Smoke after getting into chimney from boiler flue pipe continues cooling steam contained in the smoke condense by settling on chimney walls especially in unheated loft and externa...

Page 11: ...o that primary air supply valves 23 were closed or the gap was no more than 2 mm Set desired temperature by turning regulator knob to relevant position If exhauster 11 is used set its temperature in t...

Page 12: ...VIS 2 30U 2 40U 2012 02 06 To fill boiler with fuel Open firing valve 6 Open door 22 and verify that ash does not block firegrate holes 21 for air could enter hearth 27 If needed move bottom fuel laye...

Page 13: ...first time also for long period of non operation after summer season it is necessary to heat up the heat proof concrete parts for the moisture contained inside turning into steam did not disintegrate...

Page 14: ...is recommended to install electric heating elements into the boiler in the case when the boiler is connected to heating system under diagram shown in fig 4a Electric part connection works on the boile...

Page 15: ...ter supply branch G a and c connections can be inter changed During cooling coil installation After unscrewing the screws take cover from trimming shield or brake perforation away After unscrewing nut...

Page 16: ...to replace the worn bricks do this in the following sequence Through front door 22 and 24 into secondary combustion chamber 13 insert the side and the central bricks D see fig 5 Place rear bricks C an...

Reviews: