20
Installation of the Dial Ring
1.
Remove the two screws from the dial ring assembly cover and remove the cover.
Note:
Make sure the tubes are projecting through the container. If not, the tubes are not seated
properly in the lock or they were not cut to the proper length. Correct the problem before
proceeding.
2.
If necessary, rotate the tube retainer in the dial ring so that the cables come through the notch in the tube
retainer.
3.
Feed the cables through the tube retainer on the dial ring assembly and place the dial ring assembly over
the end of the tubes. Make sure the tubes are seated in the tube retainer on the dial ring assembly.
4.
Attach the dial ring to the container with the dial ring mounting screws and tighten to the specified torque.
Installation of the Cables
1.
Open the ZIF (Zero Insertion
Force) seal cover and move the
ZIF connector locking actuators
outward to their open position.
2.
Plug the cables into the ZIF
connectors with the bright metal
tabs on the cables facing toward
the circuit board to which the ZIF
connectors are mounted. Push
the cables into the connectors as
far as they will go.
3.
Close the ZIF locking actuators to lock the cables in place.
4.
Close the ZIF seal cover. When closing, be sure the tenons in the seal cover align with the holes in the
coordinating piece of the seal cover.
Open ZIF Seal Cover
Closed & Open ZIF Connectors
Seal Cover
ZIF Connectors
Closed
Open
LCD and ZIF connectors