19
!
Insert clamps (mid and end) into rail at approximate module mounting locations. To place
clamps, insert the MK3 Slot Nut of the preassembled End Clamps into the top channel on
CrossRail. While slightly llifting the plastic tabs, rotate 90º clockwise to engage into rail
channel. Place Add-On over clamps and into rail channel after clamps are installed.
!
Using the standard End Clamps, attaach the Array Skirt
to the top channel of CrossRail. Torque clamps to 10.3
ft-lbs (14 Nm). Place Array Skirt into channel ensuring
tabs lock into channel. Place clamp into rail channel.
Place Add-On over clamp and into rail channel.
Optional
8a
7
Summary of Contents for CrossRail Shared Rail System
Page 24: ...24 Notes ...
Page 25: ...25 Notes ...