5
The following guidelines apply
The CrossRail Shared Rail System can be installed as standard under the following conditions. Even if the system
is capable of meeting higher demands through the integration of safety standards, please get in touch with your
contact at K2 Systems if the specified values are exceeded.
Roof requirements
T
The structural integrity of the roof must be
reviewed on site and approved by a licensed
structural engineer.
T
Roof mean height: 0-60 ft
T
For allowable roof pitch, refert to the
CrossRail engineering letters on our website:
https://k2-systems.com/en-US/downloads/
documentation
Structural requirements
T
Wind speed: 95-200 mph
T
Ground snow load: 0-100 psf
T
Clearance: 2" to 10" clear from the top of the
roof to the top of the PV panel
T
Maximum cantilever: L/3 where "L" is the
span noted in the engineering span tables,
provided there is at least 1 module length
between maximum cantilevers
Summary of Contents for CrossRail Shared Rail System
Page 24: ...24 Notes ...
Page 25: ...25 Notes ...