ProGraMMInG
steP 2 – set waterInG days
This unit has interval watering from every day to every 15th day, individual day selection or a 365
day calendar with odd/even day selection in areas where water restrictions require this feature.
inDiviDual Day SelecTion
Turn the dial to
“Set Watering days”
and ensure that
“Prog No 1”
is showing. If not, then use the
button to select
“Prog No 1”
.
“Monday”
will be flashing.
The DiSplay Will ShoW:
This refers to Mon being Day1.
To turn Monday off press the
button. To turn it back on press the
button. To advance
to the next day and set it use the
button, the display will then flash Tue and Day 2. Use
or
to turn days ON or OFF and advance to the next day using
. Remember to set all 7 days
ON or OFF.
odd/even day selectIon (oPtIonal)
In some areas users are only allowed to water their landscapes on
odd
dates if their house number is
odd
, or
even
dates when their house number is
even
.
This controller allows this to be done simply by setting the relevant selection of odd or even and
setting the current date into the controller. The controller will account for leap years.
If you require the odd/even day option, simply press the
button until
“Odd”
is shown.
Press the
button and
“Even”
will be shown.
This feature may be required in areas where water restrictions are enforced.
note:
Remember to set the 365 day calendar when setting the clock, or this feature will be
out of sequence (refer page 6 “set calendar”).
Summary of Contents for RPS469
Page 32: ...30 Spare Watering Planner ...
Page 33: ...31 Spare Watering Planner ...
Page 34: ...32 Notes ...
Page 35: ...33 Notes ...