Maintenance
Maintenance schedule
Frequency
Task
Weekly
Visually inspect the three mirrors lens for dirt or damage.
Clean only if necessary
Weekly
Remove bed and remove detritus and clean cutting area to
prevent a build-up of residue
Weekly
Check cooling system:
1. Water in reservoir is clean and free-flowing
2. Check hoses for signs of wear
3. Check pump filter and clean if necessary
4. Laser tube is free of bubbles
Monthly
Check alignment and make adjustments if necessary
Monthly
Clean the mirrors and lens
Monthly
If the cooling system uses tap water, change the water
Monthly
Check the extraction system for a built-up of dirt or damage
to the hoses
Mirror/Lens Inspection and Cleaning
Tools & Materials:
• Mirror release tool
• Glasses cleaning cloth
• Isopropanol
• Cotton buds
• Case keys
• Z-axis operating handle
Time Needed: 10-30 minutes
Each optical element should be removed and inspected in good light for dirt
and damage.
●
Only handle optical elements by their edges, and handle as seldom as
possible to avoid damage to the optical surfaces
Mirrors
Access mirror 1 via the rear top access panel (a case key is required to open the
panel).
Summary of Contents for Blacknose A3
Page 1: ...Blacknose A3 Laser Cutter and Engraver User Guide Version 0 2 July 14th 2015 ...
Page 4: ......
Page 7: ...Machine Overview Front Left Rear Side ...
Page 8: ...Right Side Detail ...
Page 9: ...Top Cutting Bay ...
Page 26: ......