Site Preparation Checklist for SSR120
The checklist in
summarizes the tasks you need to perform when preparing a site for
SSR120 installation.
Table 7: Site Preparation Checklist
Date
Performed by
For More Information
Item or Task
Environment
“Environmental Requirements and
Verify that environmental factors such as
temperature and humidity do not exceed
appliance tolerances.
Power
Measure the distance between external
power sources and the installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
“Rack Requirements for SSR120”
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the appliance.
Plan rack location, including required space
clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk
Verify that the desk meets the minimum
requirements for the installation of the
appliance.
19
Summary of Contents for SSR120
Page 1: ...SSR120 Hardware Guide Published 2022 01 17 ...
Page 48: ...3 Verify that all four Device interfaces are up 48 ...
Page 54: ...Lithium Battery Declaration 87 ...
Page 56: ...56 ...
Page 60: ...Restricted Access Warning 60 ...
Page 72: ...Unterminated Fiber Optic Cable Warning 72 ...
Page 78: ...Jewelry Removal Warning 78 ...