Figure 20: Typical Open-Frame Rack
Related
Documentation
M120 Clearance Requirements for Airflow and Hardware Maintenance on page 41
•
•
Installing the Mounting Hardware for a Center-Mount Open-Frame Rack on page 53
•
Installing the Mounting Hardware for a Front-Mount Four-Post Rack or Cabinet on
page 49
•
Installing the Mounting Hardware for a Front-Mount Open-Frame Rack on page 51
•
Installation Safety Warnings for M Series, MX Series, and T Series Routers on page 195
•
Installing the M120 Router Without Using a Mechanical Lift on page 69
M120 Clearance Requirements for Airflow and Hardware Maintenance
When planning the installation site, you need to allow sufficient clearance around the
rack (see Figure 21 on page 42):
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Figure 16 on page 33 depicts the airflow in the router.
41
Copyright © 2010, Juniper Networks, Inc.
Chapter 3: Preparing the Site for M120 Router Installation
All manuals and user guides at all-guides.com