e. Align the chassis inner rails with the ball-bearing shuttle, as shown in
Figure 10: Aligning the Chassis Rails with the Ball-Bearing Shuttle
f. Apply even pressure on both sides; slide the chassis inner rails into the middle rails until the
locking tab of the inner rail clicks into the front of the middle rail, locking the chassis into the fully
extended position.
g. Depress the locking tabs on both sides simultaneously, and slide the chassis into the rear of the
rack.
h. Use the screws to secure the chassis handles to the rack. See
installed chassis in a four-post rack.
Figure 11: Installing the Chassis in a Four-Post Rack
33
Summary of Contents for JATP400
Page 1: ...JATP400 Appliance Hardware Guide Published 2021 05 17...
Page 8: ...1 CHAPTER Overview JATP400 System Overview 2 JATP400 Chassis 4...
Page 64: ...The hard drive pops partially out of the slot 57...
Page 65: ...Figure 24 Removing a Drive Carrier g100245 58...
Page 67: ...5 CHAPTER Troubleshooting Hardware Contacting Juniper Networks Technical Assistance Center 61...
Page 69: ...6 CHAPTER Returning the Chassis or Components Returning the JATP400 Chassis or Components 63...
Page 72: ...Maintaining the JATP400 Hard Disk Drive 56 65...