Site Preparation Checklist for an EX9251 Switch
summarizes the tasks you need to perform to prepare a site for
installing an EX9251 switch.
Table 19: Site Preparation Checklist
Item or Task
For More Information
Perfor
med
by
Date
Environment
Verify that environmental factors such
as temperature and humidity do not
exceed switch tolerances.
"Environmental Requirements and Specifications for
EX Series Switches" on page 38
Power
Measure distance between external
power sources and switch installation
site.
Calculate the power consumption and
requirements.
"Power Supply Specifications for EX9251 Switches"
on page 32
"Power Requirements for EX9251 Switch
Components" on page 31
Calculating the Fiber-Optic Cable Power Budget for
EX Series Devices
Calculating the Fiber-Optic Cable Power Margin for
EX Series Devices
Rack or Cabinet
Select the type of rack or cabinet and
verify that it meets the minimum
requirements for the installation of the
switch.
"Rack and Cabinet Requirements for EX9251
Switches" on page 48