03
.1
3 EN
8
4.3
Servicing lead-acid batteries with armour plated cells
Water quality
Z
The quality of the water used to fill up electrolyte must correspond to purified or
distilled water. Purified water can be produced through distillation or ion
exchangers and is then suitable for the production of electrolyte.
4.3.1 Daily
– Charge the battery after each discharge.
– After charging, check the electrolyte level.
– If necessary, add purified water up to the rated level after charging.
Z
The height of the electrolyte level should not be below the cell baffle or above the
top of the separator, or the "Min" and "Max" electrolyte markings respectively.
4.3.2 Weekly
– After re-charging, carry out a visual inspection for dirt and physical damage.
– If the battery is charged regularly according to the IU characteristic, carry out a
compensation charge.
4.3.3 Monthly
– Towards the end of the charging process measure and record the voltages of all
the cells with the charger switched on.
– After charging measure and record the electrolyte density and the electrolyte
temperature in all the cells.
– Compare the results with the previous ones.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
4.3.4 Annually
– Measure the truck insulation resistance in accordance with EN 1175-1.
– Measure the battery insulation resistance in accordance with EN 1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50
Ω
per volt of rated voltage.
03
.1
3 EN
8
4.3
Servicing lead-acid batteries with armour plated cells
Water quality
Z
The quality of the water used to fill up electrolyte must correspond to purified or
distilled water. Purified water can be produced through distillation or ion
exchangers and is then suitable for the production of electrolyte.
4.3.1 Daily
– Charge the battery after each discharge.
– After charging, check the electrolyte level.
– If necessary, add purified water up to the rated level after charging.
Z
The height of the electrolyte level should not be below the cell baffle or above the
top of the separator, or the "Min" and "Max" electrolyte markings respectively.
4.3.2 Weekly
– After re-charging, carry out a visual inspection for dirt and physical damage.
– If the battery is charged regularly according to the IU characteristic, carry out a
compensation charge.
4.3.3 Monthly
– Towards the end of the charging process measure and record the voltages of all
the cells with the charger switched on.
– After charging measure and record the electrolyte density and the electrolyte
temperature in all the cells.
– Compare the results with the previous ones.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
4.3.4 Annually
– Measure the truck insulation resistance in accordance with EN 1175-1.
– Measure the battery insulation resistance in accordance with EN 1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50
Ω
per volt of rated voltage.
Summary of Contents for ERE 120n
Page 1: ...Operating instructions G Operating instructions 51159400 ERE 07 09 11 13 ERE 120n ...
Page 3: ...0108 GB ...
Page 7: ...0506 GB 2 ...
Page 9: ...0505 D A 2 ...
Page 14: ...B 5 0709 GB Dimensions sheet with fixed platform ...
Page 19: ...0709 GB B 10 ...
Page 29: ...0709 GB D 6 ...
Page 32: ...E 3 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Page 34: ...E 5 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Page 38: ...E 9 1113 GB 4 1 5 13 B B B F R V 0 3 2 R V ...
Page 57: ...1113 GB E 28 ...
Page 59: ...1113 GB E 30 ...