0
709
.GB
F 8
6
Maintenance and Repairs
6.1
Preparing the truck for maintenance and repairs
All necessary safety measures must be taken to avoid accidents when carrying out
maintenance and repairs. The following preparations must be made:
– Parking the truck securely
(see Chapter E).
Z
Opening the battery panel
(see chapter D).
– Disconnect the battery (1) to prevent
the truck from accidentally starting.
– When working under a raised lift truck,
secure it to prevent it from lowering,
tipping or sliding away.
F
When raising the truck also refer to the
instructions in the “Transport and Commissioning” section (see Chapter C).
6.2
Opening the battery panel
(see chapter D).
6.3
Opening the front panel
Trucks with folding operator platform:
– Fold down the operator platform (5).
General:
– Unlock the panel latches (2) using a
spanner (width 8).
– Remove the screws (3).
– Lift off the panel (4) and place it next to
the truck.
When the work is finished, closed the
panel (4).
1
1
2
3
4
5
1
2
1
2
0
709
.GB
F 8
6
Maintenance and Repairs
6.1
Preparing the truck for maintenance and repairs
All necessary safety measures must be taken to avoid accidents when carrying out
maintenance and repairs. The following preparations must be made:
– Parking the truck securely
(see Chapter E).
Z
Opening the battery panel
(see chapter D).
– Disconnect the battery (1) to prevent
the truck from accidentally starting.
– When working under a raised lift truck,
secure it to prevent it from lowering,
tipping or sliding away.
F
When raising the truck also refer to the
instructions in the “Transport and Commissioning” section (see Chapter C).
6.2
Opening the battery panel
(see chapter D).
6.3
Opening the front panel
Trucks with folding operator platform:
– Fold down the operator platform (5).
General:
– Unlock the panel latches (2) using a
spanner (width 8).
– Remove the screws (3).
– Lift off the panel (4) and place it next to
the truck.
When the work is finished, closed the
panel (4).
1
1
2
3
4
5
1
2
1
2
Summary of Contents for ERE 120n
Page 1: ...Operating instructions G Operating instructions 51159400 ERE 07 09 11 13 ERE 120n ...
Page 3: ...0108 GB ...
Page 7: ...0506 GB 2 ...
Page 9: ...0505 D A 2 ...
Page 14: ...B 5 0709 GB Dimensions sheet with fixed platform ...
Page 19: ...0709 GB B 10 ...
Page 29: ...0709 GB D 6 ...
Page 32: ...E 3 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Page 34: ...E 5 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Page 38: ...E 9 1113 GB 4 1 5 13 B B B F R V 0 3 2 R V ...
Page 57: ...1113 GB E 28 ...
Page 59: ...1113 GB E 30 ...