
5
03.13 EN
4.2
Operation
4.2.1 Commissioning unfilled batteries
Z
The operations required must be carried out by the manufacturer's customer
service department or a customer service organisation authorised by the
manufacturer.
4.2.2 Commissioning filled and charged batteries
Checks and operations to be performed before starting daily work
Procedure
• Make sure the battery is in physically good condition.
• Make sure the terminals are correct (positive to positive and negative to negative)
and check that contacts on the battery terminal conducting system are secure.
• Check the terminal screw torques (M10 = 23 ±1 Nm) of the terminal conductors and
connectors.
• Charge up the battery.
• Check the electrolyte level.
Z
The electrolyte level must be above the cell baffle or the top of the separator.
• Add electrolyte with distilled water up to the nominal level.
Checks completed.
4.2.3 Discharging the battery
Z
To achieve an optimum useful life avoid operational discharge of more than 80% of
nominal capacity (full discharge). This corresponds to a minimum electrolyte
density of 1.13 kg/l at the end of the discharge. Recharge a discharged battery
immediately.
Summary of Contents for ERE 120
Page 1: ...07 12 02 15 51222183 ERE 120 Operating instructions G ERE C20 ERE 120...
Page 3: ...02 15 EN 4...
Page 9: ...02 15 EN 10...
Page 11: ...0506 GB 2...
Page 35: ...02 15 EN 34 The truck can now be lifted by crane...
Page 39: ...02 15 EN 38...
Page 55: ...02 15 EN 54...
Page 58: ...57 02 15 EN 2 Displays and Controls V R 49 50 5 51 50 49 11 52 53 54 7 9 8 10 6 5 48 48...
Page 64: ...63 02 15 EN 54 56 51 6 9 52 8...
Page 76: ...75 02 15 EN R V R V 0 B B B F 5 48 8 10 6 5 48 11...
Page 88: ...87 02 15 EN...
Page 157: ......