0606
.GB
E 12
4.3
Collecting and depositing loads
Z
Before lifting a load, the driver must ensure that it is correctly palletised and that the
capacity of the truck is not exceeded.
– Drive the truck with forks as far as possible underneath the load.
Z
With the two-stage Duplex mast (ZZ) a short, centre-mounted free lift cylinder initially
lifts the load carriage (free lift) without changing the overall height of the truck.
Lifting
– Press the “Raise Load Forks” switch
(10) until the required lifting height has
been reached.
Z
The lift speed can be infinitely controlled
via the switch stroke (8 mm).
Short switch stroke= slow lift
Long switch stroke= fast lift
Lowering
– Press the “Lower Load Forks” switch
(11) until the required lifting height has been reached.
Z
The lowering speed can be infinitely controlled via the switch stroke (8 mm).
Short switch stroke= slow lower
Long switch stroke= fast lower
M
Avoid suddenly depositing the load.
Safety switch height
When lifting from approx. 1.8 m (depending on the mast type):
– Travel speed reduction above the safety switch height (to approx. 4 km/h).
– Backing roller lock (
o
). The lifting hydraulics act on the backing roller cylinder. This
results in an alignment of the truck.
10
11
0606
.GB
E 12
4.3
Collecting and depositing loads
Z
Before lifting a load, the driver must ensure that it is correctly palletised and that the
capacity of the truck is not exceeded.
– Drive the truck with forks as far as possible underneath the load.
Z
With the two-stage Duplex mast (ZZ) a short, centre-mounted free lift cylinder initially
lifts the load carriage (free lift) without changing the overall height of the truck.
Lifting
– Press the “Raise Load Forks” switch
(10) until the required lifting height has
been reached.
Z
The lift speed can be infinitely controlled
via the switch stroke (8 mm).
Short switch stroke= slow lift
Long switch stroke= fast lift
Lowering
– Press the “Lower Load Forks” switch
(11) until the required lifting height has been reached.
Z
The lowering speed can be infinitely controlled via the switch stroke (8 mm).
Short switch stroke= slow lower
Long switch stroke= fast lower
M
Avoid suddenly depositing the load.
Safety switch height
When lifting from approx. 1.8 m (depending on the mast type):
– Travel speed reduction above the safety switch height (to approx. 4 km/h).
– Backing roller lock (
o
). The lifting hydraulics act on the backing roller cylinder. This
results in an alignment of the truck.
10
11
Summary of Contents for EJC 212-220
Page 1: ...Operating Instructions 50460011 EJC 212 220 G 12 05 03 07 ...
Page 3: ...0108 GB ...
Page 7: ...0506 GB 2 ...
Page 9: ...1004 GB A 2 ...
Page 19: ...0306 GB B 10 ...
Page 35: ...0606 GB D 12 ...
Page 38: ...E 3 0606 GB 1 2 3 4 5 6 7 8 9 8 10 11 12 13 ...
Page 40: ...E 5 0606 GB 1 2 3 4 5 6 7 8 9 8 10 11 12 13 ...
Page 42: ...E 7 0606 GB 1 3 4 5 6 12 ...
Page 75: ...0307 GB F 14 ...
Page 93: ...0506 GB 18 ...