C Transportation and commissioning
1
Transportation by crane
F
Only lifting gear of adequate ca-
pacity must be used
(for the transport weight, refer to
the truck identification label).
Z
Lifting gear attachment points
are provided on the chassis (1)
and the fork (2) in case the truck
is to be lifted or transported by
crane.
– Park the truck and render it
safe (refer to chapter E).
– Open front hood (5) and put
away (refer to chapter F).
– Secure the lifting gear to the
attachment points (1) and (2).
M
The lifting gear must be at-
tached to the attachment points
in such a manner that it abso-
lutely cannot slip and cannot
come into contact with any at-
tachments of the truck when the
truck is lifted.
2
Commissioning
M
The truck must only be operated on battery current. Rectified alternate current will
damage the electronics. Cables connected to the battery (trailing cables) must be
less than 6 meters in length.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
– Check the truck for completeness and satisfactory condition of the equipment.
– If necessary, install the battery. Do not damage the battery cable
(refer to chapter D).
– Charge the battery (refer to chapter D).
– Commission the truck as detailed in chapter E.
Z
When the truck is parked for extended periods, the running surface of the tyres may
flatten. The flattening will disappear after a short operating time of the truck.
2
1
C 1
11
06
.G
B
C Transportation and commissioning
1
Transportation by crane
F
Only lifting gear of adequate ca-
pacity must be used
(for the transport weight, refer to
the truck identification label).
Z
Lifting gear attachment points
are provided on the chassis (1)
and the fork (2) in case the truck
is to be lifted or transported by
crane.
– Park the truck and render it
safe (refer to chapter E).
– Open front hood (5) and put
away (refer to chapter F).
– Secure the lifting gear to the
attachment points (1) and (2).
M
The lifting gear must be at-
tached to the attachment points
in such a manner that it abso-
lutely cannot slip and cannot
come into contact with any at-
tachments of the truck when the
truck is lifted.
2
Commissioning
M
The truck must only be operated on battery current. Rectified alternate current will
damage the electronics. Cables connected to the battery (trailing cables) must be
less than 6 meters in length.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
– Check the truck for completeness and satisfactory condition of the equipment.
– If necessary, install the battery. Do not damage the battery cable
(refer to chapter D).
– Charge the battery (refer to chapter D).
– Commission the truck as detailed in chapter E.
Z
When the truck is parked for extended periods, the running surface of the tyres may
flatten. The flattening will disappear after a short operating time of the truck.
2
1
Summary of Contents for 50435801
Page 1: ...Operating instructions 50435801 G 04 04 03 07 ECE 220...
Page 3: ...0108 GB...
Page 7: ...0506 GB 2...
Page 9: ...0404 GB A 2...
Page 28: ...E 5 1106 GB S T O P 12 13 14 16 15 17...
Page 83: ...0506 GB 18...