Initial operation
54
7.6 Fill device
This section describes how the device should be filled with bath fluid during
initial operation.
Specifications for filling volume can be found in the technical data.
The drain valve is closed.
The device is switched off.
1. Remove the bath lid.
2. Half fill the bath with bath fluid.
The bath fluid expands with increasing temperature and can overflow.
With decreasing temperature, the low liquid level protection can be
triggered and interrupt the temperature control process.
3. Switch the unit on and start the temperature control application.
4. Watch the level indicator and, if necessary, adjust the level by refilling or
draining.
Once the working temperature has been reached and the sample inserted,
the level of bath fluid in the bath tank should cover the heating coil of the
heating circulator or the cooling coil of the refrigeration unit.
5. Close the bath opening with the bath lid.
The device is filled with bath fluid.
7.7 Set up power supply for the refrigerated circulator
For a refrigerated circulator, the power supply is configured at the factory. The
circulator is supplied with power from the refrigeration unit via a mains
extension cable. Alternatively, both devices can be connected to separate
circuits with one power cable each. The type of power supply is set in the
operating menu.
The cooling machine is connected.
1. Switch the device on at the mains switch.
2. Call up the
<Main menu>
.
3.Call up the submenu <Install unit> then the menu option <Power supply>.3
4. Select the type of power supply:
[Supply via chiller]
for connection to the
same power grid or
[Separate supply]
for connection to a different power
grid.
[Supply via chiller]
activates the heating capacity limit of the circulator.
It prevents the device combination from exceeding a defined maximum
current consumption and thus from overloading the power grid.
The power supply for the refrigerated circulator is set up.