
– 78 –
Inner cords of the power switch shall be connected as
specified below.
200V wiring
Make connections between 1-2, without fail.
No operation takes place if connections are made
between 1-3 or between 2-3.
(Bo
e)
(Box side)
(Plug side)
How to make changes for 100V to 120V
↔
200V to 240V
WARNING :
To prevent personal injuries caused by electric shock hazards or abrupt start of the sewing machine, carry
out the work after turning OFF the power switch and a lapse of 5 minutes or more. To prevent accidents
caused by unaccustomed work or electric shock, request the electric expert or engineer of our dealers when
adjusting the electrical components.
By changing the two points specified below, it is possible to make a
voltage changeover to any of single-phase 100V to 120V, single-
phase 200V to 240V, and 3-phase 200V to 240V.
1
Power cord replacement
2
FLT board changeover connector
exchange
1) Confirm that the sewing machine is assuredly stopped. Then,
turn off the power supply by means of the POWER switch.
2) Confirm that the POWER switch is OFF and pull off the power
cord from the wall outlet. Since then, wait for at least five minutes.
3) Loosen three screws used to fasten the rear cover of the control
box. Carefully open the rear cover.
[For a changeover of 200V to 240V
→
→
→
→
→
100V to 120V]
(Caution) If the method of changeover is confused, the control
box may be destroyed. Therefore, changeover
actions must be taken carefully.
1) Replacement of the power cord
Change to JUKI authentic part number (M90355800A0) and the
earth cord (M90345800A0).
2) Changeover connector exchange
The voltage changeover connector
is mounted on the FLT
board. Insert this connector in the 100V position.
3) Confirmation of change
Confirm that connection changes have been carried out correctly.
[For a changeover of 100V to 120V
→
→
→
→
→
200V to 240V]
(Caution) If the method of changeover is confused, the control
box may be destroyed. Therefore, changeover
actions must be taken carefully.
[Essentials for connector insertion]
If it is difficult to remove the voltage changeover connector
, insert
a small screwdriver or the like as illustrated and push it toward the
direction of the arrow. Then the connector comes out easily.
1) Replacement of the power cord
Change to JUKI authentic part number (M90175800A0)
2) Changeover connector exchange
The voltage changeover connector
is mounted on the FLT
board. Insert this connector in the 200V position.
3) Confirmation of change
Confirm that connection changes have been carried out correctly.
4) Paying attention not to cause the pinching of cords between the
rear cover and the control box main body, tighten the three screws
while the rear cover is pressed.
100V
specifications
200V
specifications
(2) Method of voltage changeover