Installation
1701649 • 2019/04
JUDO JPF-A
13
JPF-A 2½" - 4"
JPF-A 2½" - 4"
CAUTION
The ball valves are secured with a sealing adhesive.
When screwing a sewage pipe in the ball valve, the adhesive bond could be dam-
aged.
Secure the ball valve against twisting when screwing in a sewage pipe!
4.5
Commissioning
Prior to initial commissioning (or to com-
missioning after maintenance work) fill the
installed device with water and vent:
1.
Open the upstream shut-off valve to fill
the device with water. The device is now
under mains pressure.
2.
Plug the power supply unit in.
3. Attention:
Carry out a backwashing
immediately so that the trapped air can
escape (see chapter
5.2.5
)! This
prevents
damage to the installation by
water ham-mer pressure surges.
After backwashing, the device is vented
and ready for operation.
Summary of Contents for PROFIMAT JPF-A 1 1/2"
Page 28: ...Technical data 28 JUDO JPF A 1701649 2019 04 9 4 Circuit diagram for device control...
Page 30: ...Technical data 30 JUDO JPF A 1701649 2019 04 9 5 Spare parts JPF A 1...
Page 33: ...Technical data 1701649 2019 04 JUDO JPF A 33 JPF A 1 2...
Page 36: ...Technical data 36 JUDO JPF A 1701649 2019 04 JPF A 2 4...