V:\Mark\AP-F6 Operation Manual.doc
6
JST
AP-F6 PNEUMATIC CRIMPING MACHINE
4. PREPARATION FOR OPERATION
4.1 Mounting the Reel Hanger
Assemble the reel hanger, as per the
parts list, and mount onto the crimping
press with the two cap head screws
provided, as illustrated.
4.2 Mounting the Crimping Dies
CAUTION !
Ensure that the press is
disconnected from the electricity
and air supplies before mounting
the die-set.
When the machine is shipped, the
ram of the crimping press is in the
open position. Sometimes the ram
falls down under its own weight during
transit, and as a result the dies cannot
be fitted.
If the above condition is experienced,
please consult the instructions in
section 4.8 before continuing.
Insulated Terminals
Step 1, Upper crimping die mounting
procedure.
Position the conductor punch in the
ram
and place insulation punch on top.
Secure them both in the ram with the
cap head screw supplied, whilst
simultaneously pushing the punches
in an upward direction, to ensure they
are tightly pressed on the ram.