49 | Operation
Each of the above items are calculated into a number from 0 to 10, then added to a total. This total is compared to other
sensors to determine the weight of this sensor.
2.3.6.3 Acoustic Sensor
ACOUSTIC section (suitable for 2 different echo devices):
•
Comport Status / sample time.
•
Display of raw values distance to transponder; X and Y (m).
•
Display transponder status (fixed or Mobile).
•
Check box to use this device.
•
Display North and East distance to transponder at rotation point (m).
•
Latched distance to transponder (Latched = Error from weighed).
•
Error north / east (m).
•
Parameter for manual rating per device (0~100).
•
Sensor weighing section.
•
Display of calculated rating.
•
Display of deviation from weighed over a longer period.
•
Display of error from weighed.
•
Weight bar graph (0~1).
Laser section (suitable for 1 device):
•
Comport Status / sample time.
•
Display of raw values distance to target; A and B (m).
•
Check box to use this device.
•
Display North and East distance to target at rotation point (m).
•
Latched distance to target (Latched = Error from weighed).
•
Error north / east (m).
•
Parameter for manual rating per device (0~100).
•
Sensor weighing section.
•
Display of calculated rating.
•
Display of deviation from weighed over a longer period.
•
Display of error from weighed.
•
Weight bar graph (0~1).
Taut wire section (suitable for 1 device):
•
Comport Status / sample time.
•
Display of raw values distance to clump; A and B (m).
•
Check box to use this device.
•
Display North and East distance to clump at rotation point (m).
•
Latched distance to clump (Latched = Error from weighed).
•
Error north / east (m).
•
Parameter for manual rating per device (0~100).
•
Sensor weighing section.
•
Display of calculated rating.
•
Display of deviation from weighed over a longer period.
•
Display of error from weighed.
•
Weight bar graph (0~1).
Summary of Contents for Alphatron Marine AlphaDynaPos
Page 1: ...AlphaDynaPos Ship Automation and Navigation system Operation Manual www jrc am ...
Page 5: ...5 Contents 4 2 Appendix B Checklist for Taking DP system into Operation 85 ...
Page 13: ...13 Introduction III 3 System Overview DP2 Figure 2 system Overview DP2 ...
Page 14: ...14 Introduction III 4 Sensor Overview Figure 3 Sensor Overview ...