www.jouleuk.co.uk | www.joule.ie
32
Un-Plumbed Cylinder Schematic
Mechanical Diagram Y-Plan
Un-Plumbed Cylinder Schematic
Mechanical Diagram Y-Plan
8
7
1
2
9
3
5
6
10
4
11
Secondary
Return
Cold Main
Secondary Flow
Balanced Cold
Connection
High Limit
Stat
Boiler Prim. Flow
Boiler Prim. Return
Dual
Stat
1 Bronze Pump
2 Non Return Valve (not supplied)
3 Inlet Control Group
4 Temperature & Pressure Relief Valve
5 Isolation Valve (not supplied)
6 Exp. Vessel with Wall Bracket
7 2-port Zone Valve
8 3-port Valve (not supplied)
9 Drain Valve (not supplied)
10 Tundish
11 Heating Circ. Pump (required where boiler has no internal pump)
Summary of Contents for Cyclone series
Page 52: ...www jouleuk co uk www joule ie 52 48 Direct Indirect Mains Pressure Benchmark Checklist...
Page 53: ...Cyclone Direct Indirect Installation Guide 53 49 Water Storage System Commisioning...
Page 55: ...Cyclone Direct Indirect Installation Guide 55 Notes...
Page 56: ...www jouleuk co uk www joule ie 56 Notes...
Page 57: ...Cyclone Direct Indirect Installation Guide 57...