3
INSTALLATION INSTRUCTIONS
Before installing the TEC-44, make sure it complies with your request and that it suits your application!
1. Unpack the TEC-44 and visually inspect for any transport damage incurred after leaving our factory.
2. Depressurise the system before installation or maintenance is carried out!
3. Locate a suitable condensate draining point in your compressed air system to connect your TEC-44.
-
Connect the outlet to an oil/water separator.
4. After double checking that the power supply corresponds with the voltage specified on your TEC-44, you can
switch it ON.
5. The TEC-44 will start up in program 4 (see chart 1, page 6). Any changes to the program selection will be stored.
Refer to step 6 and 7 for program selections.
6.
CHANGING THE INTERVAL TIME CYCLE.
Should the pre-set interval time cycle (4) not be suitable for your requirements, alternative interval times can be selected.
Refer to chart 1 (page 6) and select the program best suited to your requirements.
Follow the procedure below to change the program:
a. Choose the preferred program (0 - 9 or -).
b. Press [SET] until your program number is displayed.
7.
CHANGING THE ROTATION TIME CYCLE.
Should the pre-set rotation time cycle (A) not be suitable for your requirements, alternative rotation times can be selected.
Refer to chart 2 (page 6) and select the program best suited to your requirements.
Follow the procedure below to change the program:
a. Press [SET] and [TEST] simultaneously.
b. Press [SET] to select required time.
c. Press [TEST] to confirm selection.
d. The TEC-44 is now programmed to your desired program settings and will work fully automatically.
8. Slowly pressurise the system.
9. Your TEC-44 is ready for operation!
Summary of Contents for TEC-44
Page 1: ...1 Installation instructions 10 2015 ...
Page 4: ...4 1 2 3 4 5 6 7 8 9 ...
Page 11: ...11 SERVICE CHART Date Description Name ...
Page 12: ...12 DIMENSIONS mm ...