31
ENGLISH
08.7
SCHEDULED PREVENTIVE MAINTENANCE (To be done by a specialised Technical Service Center)
We wish to remind you that the Extraordinary Maintenance to be carried out on this type of product must be done obligatorily every year
by qualified maintenance personnel, in order to maintain its functionality, efficiency and comfort.
For any further queries you may have, we invite you to contact the specialised Technical Service Center through your retailer. Scheduled
maintenance must include:
• Cleaning of the flue (with special focus on horizontal segments)
•
Stove fume pass cleaning
•
Cleaning of any deposits in the stove
•
Cleaning of fans
•
Check good ignition resistance operations
•
Check electric/electronic system integrity
• Check safety device, thermostat and pressure switch status and efficiency
•
Check the condition of the sealing gaskets, paying special attention to the one on the closure of the combustion chamber
door.
•
Check the condition of the ceramic glass.
•
Check the pellet loading gear motor is working properly.
•
Clean the bottom of the pellet hopper.
To carry out these operations, the appliance must be disconnected from the mains; wait until the appliance is cold
and comply rigorously with the safety regulations in force
WARNING
Summary of Contents for AMBRIA2
Page 34: ...34 NOTES...
Page 35: ...35 ENGLISH NOTES...