SECTION 4 - POST START-UP DATA
FORM 145.05-SU7
ISSUE DATE: 10/31/2019
FOR TECHNICAL ASSISTANCE:
Contact Johnson Controls, Applied Ducted Systems Product Technical Support (PTS) at Applied-
17. The Supply Fan continues to operate as long as
the unit shows OCCUPIED STANDBY.
Starting the Unit in Heating Mode-Variable Air
Volume (VAV) / Flexsys
1. The unit must have 24vac to the SD terminal.
Turning the OFF/AUTO/ON rocker switch to ON
provide this signal.
2. The unit must have 24vac to OCC terminal, the
Occupied Command is being communicated, or
the internal timeclock enabled and set to go oc-
cupied at a specific time.
3. The supply fan should start after the unit goes Oc-
cupied after a slight delay.
4. Verify that the duct static is reading correctly ver-
sus the Setpoint under the SUPPLY FAN key.
5. The unit mode under the STATUS key OCCU-
PIED STANDBY.
6. The temperature of the return air compared to the
RETURN AIR HEATING SETPOINT under the
SETPOINTS key subsection HEATING.
7. If the return air temperature is less than the RE-
TURN AIR HEATING SETPOINT by .5 degrees
the unit mode switch to OCCUPIED HEATING.
8. The supply air temperature compared to the
HEATING SAT in the SETPOINTS key subsec-
tion HEATING.
9. If the supply air temperature is lower than the cur-
rent SAT HEATING SETPOINT, the controller
activate the heating section.
10. The heating section operate maintaining the SAT
HEATING SETPOINT.
11. When the return air temperature increases .5
degrees above the RETURN AIR HEATING
SETPOINT the unit switch to OCCUPIED
STANDBY.
12. The Supply Fan continues to operate as long as
the unit mode shows OCCUPIED STANDBY.
If UNOCCUPIED HEATING used you
must ENABLE NIGHT SET BACK in the
PROGRAM key subsection HEATING.
A zone temperature input is required or
the unit fault.
Summary of Contents for LSWD
Page 4: ...JOHNSON CONTROLS 4 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Page 10: ...JOHNSON CONTROLS 10 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Page 11: ...JOHNSON CONTROLS 11 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 PRE START UP CHECKLIST ...
Page 12: ...JOHNSON CONTROLS 12 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Page 13: ...JOHNSON CONTROLS 13 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Page 14: ...JOHNSON CONTROLS 14 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Page 15: ...JOHNSON CONTROLS 15 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Page 16: ...JOHNSON CONTROLS 16 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Page 17: ...JOHNSON CONTROLS 17 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Page 18: ...JOHNSON CONTROLS 18 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Page 19: ...JOHNSON CONTROLS 19 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Page 20: ...JOHNSON CONTROLS 20 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Page 30: ...JOHNSON CONTROLS 30 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Page 34: ...JOHNSON CONTROLS 34 ...
Page 35: ...JOHNSON CONTROLS 35 ...
Page 36: ...JOHNSON CONTROLS 36 ...
Page 37: ...JOHNSON CONTROLS 37 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...