- 10 -
User Guide
JVC65RBTN
S Y M B O L S O N C O N T R O L PA N E L
Main power switch
Speed control
Brush motor switch
Brush motor switch
U N PA C K T H E M A C H I N E
1. Check the package for any discrepancies. If you find any discrepancies, please notify the delivery
agent.
2. Check that you have all the parts of the unit and its components by referring to the equipment list
below. If any parts are missing, please contact your distributor.
Freight List:
• 1 Key
• 2 - 12V batteries
• 120V, 15A intelligent charger
• 8 connecting cable, 37 cm
• 4 rubber covers for battery connection
• 1 set of squeegee assembly
• 2 brushes
3. Remove the steel fixed block before unpacking the machine. Unload the machine off the rack carefully
with the assistance of other personnel.
NOTE:
Do not push the machine directly without using the cargo handling apron in case of damages.
NOTE:
To avoid damages to the machine, fix the batteries after the machine is unloaded from the rack.