13
Joerns® Bed Frames
EasyCare
®
© 2015 Joerns Healthcare • 6110158 RevC • 15-2537
To Remove Control Box
1. Plugs and outlets are numbered and color-coded
so they can be easily reinstalled later (See
Actuator And Control Box Identification).
2. Unplug from wall outlet.
3. Unplug all actuator cords and pendant/staff
control plug.
4.
Remove the control box retaining clip (Figure 33).
5.
Slide the Control Box off the actuator assembly.
6.
To replace the Control Box, reverse
these instructions.
To Remove Actuator
Recommended Tools: Screwdriver, Hammer,
Masking Tape, Zip Ties
1.
Identify the actuator to be replaced.
2. Tip the bed on its side to replace high/low
actuator(s).
3. Unplug the actuator cord.
4.
The actuator is held in place by two pins. Use a
screwdriver to remove the lock ring on each pin.
5.
Slide the pins out of holes. If necessary, use the
hammer to tap out the pins.
6.
You may now replace the actuator(s).
7. To reassemble the bed, reverse the previous
steps, making note of the following two important
items:
• Assemble the pin and lock rings as
originally installed.
•
Zip-ties should be replaced, with cords returned
to their original position and routing direction to
the control box.
Figure 33
To Remove AC Power Cable
Recommended Tools: Small Screwdriver, Masking
Tape, Zip Ties, 5/16" Nut Driver
1.
Raise the bed so that there is about 27 inches
of clearance between the floor and the mattress
support platform of bed.
2. Unplug the power cable from the outlet.
3.
Cut the zip-ties that hold the power cable to the
frame. Tape the remaining cables in their original
position. It is very important to keep the actuator
cables routed along the frame in their original
factory-installed positions. If this step is not
followed, damage to cables or electric shock may
result.
4. Detach the ground wire from the bed frame
if equipped.
Warning: Possible Shock Hazard.
Injury may result
from improper power cable routing. Always follow
proper factory-installed routing configuration. Be sure
to check condition of the power cable on a regular
basis. Do not use damaged or frayed power cables.
5.
Using a small screwdriver, alternately depress
the small red latch tabs above and below AC
receptacle on the control box. Simultaneously,
pull gently outward on the power cable where it
connects to the control box, until the plug comes
out.
6. Plug the replacement cable into the control box
until it latches. Attach the ground wire to the bed
frame.
7.
Re-route the power cable along the frame in the
same position as the original routing.
8. Replace zip-ties along with cables in their original
position and routing to the control box. If this step
is not followed, damage to the cables or electric
shock may result.