
MAINTENANCE
171
MUX20JP021602
Boom
Lift
Models X20JPLUS
8
Activate
the
movement
of
the
extendible
arms
several
times
and
check
that
the
residual
loads
on
the
ropes
are
10Nm
.
9
This
procedure
could
require
several
attempts
before
it
is
completed
correctly.
10 The
adjustment
is
correct
when
the
ropes
do
not
emit
any
noise
during
ex
‐
tension
or
return
and
the
torque
value
prescribed
is
reached
on
all
of
the
ro
‐
pes.
11
Once
calibration
has
been
concluded,
tighten
the
counternuts
and
re
‐
mount
the
sump.
12.15.4.Five
‐
yearly
inspection
The
replacement
of
the
cables
and
pulleys
is
advisable
every
5
years,
even
in
shor
‐
ter
time
according
to
the
working
hours.
Further
inspections
of
the
extension
system
are
required
in
the
following
situa
‐
tions:
• Machine
exposed
to
extreme
environmental
conditions
(for
example
low
tem
‐
peratures,
sea
environments,
etc.).
• Incorrect
movement
of
the
arms
or
noises
caused
by
the
movement
of
the
ex
‐
tensions.
• Unused
machine
for
long
periods.
• Overloaded
machine
or
subject
to
collisions.
• Machine
subject
to
short
circuit,
the
ropes
could
be
damaged
internally.
Fig.
172
Exit
ropes
nuts
fixing
Fig.
173
Ropes
terminal
Fig.
174
Tension
ropes
re
‐
gulation
Do
not
subject
the
ropes
to
torsion.
Summary of Contents for X20JPLUS
Page 2: ......
Page 8: ...MUX20JP021602 6 Boom Lift Models X20JPLUS...
Page 34: ...32 Boom Lift Models X20JPLUS TECHNICAL INFORMATIONS MUX20JP021602...
Page 35: ...TECHNICAL INFORMATIONS 33 MUX20JP021602 Boom Lift Models X20JPLUS...
Page 163: ...MAINTENANCE 161 MUX20JP021602 Boom Lift Models X20JPLUS...
Page 199: ...WIRING DIAGRAM 197 MUX20JP021602 Boom Lift Models X20JPLUS 16 WIRING DIAGRAM...
Page 200: ...198 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 183 Petrol...
Page 201: ...WIRING DIAGRAM 199 MUX20JP021602 Boom Lift Models X20JPLUS Fig 184 Diesel...
Page 202: ...200 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 185 Lithium...
Page 204: ...202 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Worldwide locations...
Page 205: ......