Index
2
31200749
H
Hazard Classification System........... 1-1
Hydraulic Oil Level.......................... 7-19
Hydraulic Operated Attachment ..... 5-12
Hydraulic System.............................. 9-3
I
Ignition .............................................. 3-6
Instrument Cluster ............................ 3-4
L
Leveling Procedure.................... 4-5, 4-8
Lifting Personnel............................... 1-8
Load Falling Hazard ......................... 1-7
Lubrication and Maintenance ........... 7-1
Lubrication Schedule
1000 Hour ................................. 7-11
250 Hour ..................................... 7-9
50 Hour ....................................... 7-7
M
Mast Carriage ................................. 5-22
O
Operating with a Non-Suspended
Load.................................................. 4-4
Operating with a Suspended Load ... 4-7
Operation.......................................... 4-1
Operational Check.......................... 2-12
Operator Cab.................................. 2-13
Operator Maintenance
Instructions ..................................... 7-12
Operator Seat ................................. 3-18
Outrigger Switches ......................... 3-13
P
Park Brake ........................................3-7
Parking Procedure ............................3-7
Performance......................................9-5
Personnel Work Platform ................5-34
Picking Up a Load .............................4-4
Picking Up a Suspended Load..........4-7
Pinch Points and Crush Hazards ....1-10
Placing a Load ..................................4-6
Placing a Suspended Load ...............4-9
Pre-Operation Check and
Inspection..........................................2-1
R
Restriction Indicator .............. 7-14, 7-16
S
Safety Practices ................................1-1
Safety Signal Words..........................1-1
Seat Belt..........................................3-19
Service and Maintenance Schedule
10 Hour ........................................7-3
1000 Hour ....................................7-5
1500 Hour ....................................7-6
1st 50 Hour ..................................7-3
1st 500 Hour ................................7-4
2000 Hour ....................................7-6
250 Hour ......................................7-4
50 Hour ........................................7-4
500 Hour ......................................7-5
Shut-Down Procedure.......................4-3
Side Tilt Carriage ............................5-16
Specifications ....................................9-1
Stabil-Trak System..........................3-16
Test..............................................8-1
Summary of Contents for Skytrak 10042
Page 3: ...Revision Log a 31200749 Revision Log REVISION LOG March 30 2012 A Original Issue of Manual ...
Page 24: ...Section 1 General Safety Practices 1 14 31200749 This Page Intentionally Left Blank ...
Page 33: ...Section 2 Pre Operation and Inspection 2 9 31200749 This Page Intentionally Left Blank ...
Page 70: ...Section 4 Operation 4 12 31200749 This Page Intentionally Left Blank ...
Page 75: ...Section 5 Attachments 5 5 31200749 This Page Intentionally Left Blank ...
Page 79: ...Section 5 Attachments 5 9 31200749 This Page Intentionally Left Blank ...
Page 106: ...Section 5 Attachments 5 36 31200749 This Page Intentionally Left Blank ...
Page 116: ...Section 7 Lubrication and Maintenance 7 8 31200749 10054 OH4242 50 EVERY ...
Page 118: ...Section 7 Lubrication and Maintenance 7 10 31200749 8042 10042 10054 OH4172 EVERY 250 ...
Page 148: ...Index 4 31200749 ...
Page 150: ...Inspection Maintenance and Repair Log Date Comments ...
Page 152: ......