Section 4 - Operation
4-9
31200749
Placing a Suspended Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align load at the level load is to be placed, then position boom slowly until load is
just above area where it is to be placed.
• Ensure that the guide persons and operator remain in constant communication
(verbal or hand) when placing the load.
Disengaging a Suspended Load
• Never place the guide persons between the suspended load and the telehandler.
• Once at the destination of the load, ensure to bring the telehandler to a complete
stop and apply the park brake prior to disengagement of the lifting devices and
tethers.
Summary of Contents for Skytrak 10042
Page 3: ...Revision Log a 31200749 Revision Log REVISION LOG March 30 2012 A Original Issue of Manual ...
Page 24: ...Section 1 General Safety Practices 1 14 31200749 This Page Intentionally Left Blank ...
Page 33: ...Section 2 Pre Operation and Inspection 2 9 31200749 This Page Intentionally Left Blank ...
Page 70: ...Section 4 Operation 4 12 31200749 This Page Intentionally Left Blank ...
Page 75: ...Section 5 Attachments 5 5 31200749 This Page Intentionally Left Blank ...
Page 79: ...Section 5 Attachments 5 9 31200749 This Page Intentionally Left Blank ...
Page 106: ...Section 5 Attachments 5 36 31200749 This Page Intentionally Left Blank ...
Page 116: ...Section 7 Lubrication and Maintenance 7 8 31200749 10054 OH4242 50 EVERY ...
Page 118: ...Section 7 Lubrication and Maintenance 7 10 31200749 8042 10042 10054 OH4172 EVERY 250 ...
Page 148: ...Index 4 31200749 ...
Page 150: ...Inspection Maintenance and Repair Log Date Comments ...
Page 152: ......