Section 4 - Operation
4-6
31200749
Placing a Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align forks at the level load is to be placed, then extend boom slowly until load is
just above area where it is to be placed.
• Lower the boom until the load rests in position and the forks are free to retract.
Disengaging a Load
Once the load has been placed safely at the landing point, proceed as follows:
1. With the forks free from the weight of the load, the boom can be retracted
and/or the telehandler can be backed away from under the load if surface will
not change level condition of telehandler.
2. Lower the carriage.
3. The telehandler can now be driven from the landing location to continue work.
Summary of Contents for Skytrak 10042
Page 3: ...Revision Log a 31200749 Revision Log REVISION LOG March 30 2012 A Original Issue of Manual ...
Page 24: ...Section 1 General Safety Practices 1 14 31200749 This Page Intentionally Left Blank ...
Page 33: ...Section 2 Pre Operation and Inspection 2 9 31200749 This Page Intentionally Left Blank ...
Page 70: ...Section 4 Operation 4 12 31200749 This Page Intentionally Left Blank ...
Page 75: ...Section 5 Attachments 5 5 31200749 This Page Intentionally Left Blank ...
Page 79: ...Section 5 Attachments 5 9 31200749 This Page Intentionally Left Blank ...
Page 106: ...Section 5 Attachments 5 36 31200749 This Page Intentionally Left Blank ...
Page 116: ...Section 7 Lubrication and Maintenance 7 8 31200749 10054 OH4242 50 EVERY ...
Page 118: ...Section 7 Lubrication and Maintenance 7 10 31200749 8042 10042 10054 OH4172 EVERY 250 ...
Page 148: ...Index 4 31200749 ...
Page 150: ...Inspection Maintenance and Repair Log Date Comments ...
Page 152: ......