SECTION 5 - HYDRAULICS
3121160
– JLG Lift –
5-13
12.
Using all applicable safety precautions, operate the
boom functions. Check for correct operation and
hydraulic leaks. Secure as necessary.
13.
Check fluid level of hydraulic tank and adjust as nec-
essary.
Tower Boom Lift Cylinder Removal
1.
Place machine on a flat and level surface. Place the
main boom in a horizontal position with the tele-
scope cylinder fully retracted. Place the tower boom
in a fully elevated and fully retracted position.
2.
Support the main boom, upright, and tower boom
with adequate overhead crane.
3.
Adequately support the tower lift cylinder.
4.
Remove mounting hardware securing the lift cylin-
der rod pin to the tower boom. Using a suitable
brass drift, drive out the tower lift cylinder rod attach
pin.
5.
Using all applicable safety precautions, operate aux-
iliary power, activate tower lift down and fully retract
lift cylinder.
6.
Tag, disconnect and cap the tower lift cylinder
hydraulic lines and ports.
7.
Remove mounting hardware securing the tower lift
cylinder barrel pin to the turntable. Using a suitable
brass drift, drive out the tower lift cylinder barrel pin.
8.
Carefully remove the tower lift cylinder from turnta-
ble. Place in a suitable work area.
Tower Lift Cylinder Installation
1.
With the main boom and tower boom supported.
Place the tower lift cylinder in position on the turnta-
ble and secure in place.
2.
Align holes in turntable and lift cylinder. Using a suit-
able rubber mallet, install the cylinder barrel pin and
secure with mounting hardware.
3.
Remove caps from temporary hydraulic lines and
attach to lift cylinder ports. Using auxiliary power,
activate tower lift function and extend cylinder rod
until the cylinder rod bushing aligns with bushings
on boom.
4.
Using an appropriate brass drift, drive the tower lift
cylinder rod end attach pin through the aligned
bushings. Secure pin with attaching hardware.
5.
Remove temporary hydraulic lines from cylinder
ports and cap lines.
6.
Remove caps from cylinder hydraulic lines and cor-
rectly install lines to cylinder as previously tagged.
7.
Remove main boom support and overhead crane
supporting the upright. Activate hydraulic system.
8.
Using all applicable safety precautions, operate the
boom functions. Check for correct operation and
hydraulic leaks. Secure as necessary.
9.
Check fluid level of hydraulic tank and adjust as nec-
essary.
Slave Cylinder Removal
1.
Place the machine on a flat surface and lower the
main boom and tower boom to the lowest position.
2.
Using auxiliary power, retract the slave cylinder rod
completely.
3.
Using a suitable lifting device, properly secure the
platform to prevent the platform from tilting back-
ward or forward during removal of the slave cylinder.
4.
Mark and disconnect the slave cylinder hydraulic
hoses. Cap hoses to prevent the hydraulic system
from being contaminated.
5.
Properly secure the slave cylinder by using a suit-
able sling or support.
6.
Remove the slave cylinder pin retaining hardware.
Using a suitable brass drift, remove the slave cylin-
der pins from the rod and barrel ends.
7.
Carefully remove the slave cylinder.
8.
Clean and inspect the cylinder pins and retaining
hardware for reuse. replace if necessary.
Slave Cylinder Installation
1.
Remove fittings from old cylinder and install in new
slave cylinder. Plug the port block holes in the old
cylinder with the plugs removed from the new cylin-
der.
2.
Position the new cylinder in place using suitable
slings or support. Align barrel end mounting holes
with main fly holes.
3.
Using a suitable plastic or rubber hammer, drive the
barrel end attach pin into place and install retaining
hardware.
4.
Remove caps from hydraulic hoses and attach
hoses to proper cylinder port.
5.
Using auxiliary power, extend the slave cylinder rod
until the rod attach pin hole aligns with those in the
platform pivot. Using a suitable plastic or rubber
hammer, drive the pin in place and install the retain-
ing hardware.
6.
Remove sling from the slave cylinder and support
from platform.
Summary of Contents for 740A
Page 1: ...Service and Maintenance Manual Models 740A 740AJ P N 3121160 January 8 2013 ...
Page 2: ......
Page 52: ...SECTION 2 GENERAL 2 12 JLG Lift 3121160 NOTES ...
Page 109: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 57 Figure 3 39 Swing Hub ...
Page 135: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 83 Figure 3 48 Rotary Coupling Port Location ...
Page 153: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 101 Figure 3 54 EFI Component Location ...
Page 156: ...SECTION 3 CHASSIS TURNTABLE 3 104 JLG Lift 3121160 Figure 3 55 ECM EPM Identification ECM EPM ...
Page 173: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 121 Figure 3 65 EMR2 Fault Codes Sheet 1 of 5 ...
Page 174: ...SECTION 3 CHASSIS TURNTABLE 3 122 JLG Lift 3121160 Figure 3 66 EMR2 Fault Codes Sheet 2 of 5 ...
Page 175: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 123 Figure 3 67 EMR2 Fault Codes Sheet 3 of 5 ...
Page 176: ...SECTION 3 CHASSIS TURNTABLE 3 124 JLG Lift 3121160 Figure 3 68 EMR2 Fault Codes Sheet 4 of 5 ...
Page 177: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 125 Figure 3 69 EMR2 Fault Codes Sheet 5 of 5 ...
Page 244: ...SECTION 4 BOOM PLATFORM 4 28 JLG Lift 3121160 Figure 4 14 Rotator Assembly HELAC ...
Page 286: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121160 NOTES ...
Page 307: ...SECTION 5 HYDRAULICS 3121160 JLG Lift 5 21 Figure 5 17 Variable Displacement Pump Rexroth ...
Page 316: ...SECTION 5 HYDRAULICS 5 30 JLG Lift 3121160 NOTES ...
Page 319: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 3 Figure 6 2 ADE Block Diagram ...
Page 328: ...SECTION 6 JLG CONTROL SYSTEM 6 12 JLG Lift 3121160 Figure 6 11 Control Module Location ...
Page 374: ...SECTION 6 JLG CONTROL SYSTEM 6 58 JLG Lift 3121160 NOTES ...
Page 406: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121160 NOTES ...
Page 407: ......