JLG 4108AN Operation And Safety Manual Download Page 13

MACHINE SET UP AND PACK UP

4108AN

THE  NEXT  STEPS  REFER  TO 
RAISING  THE  MAST.  CHECK 
AND 

ENSURE 

THAT 

NO 

OBSTRUCTIONS ARE LOCATED 
ABOVE THE UNIT TO A HEIGHT 
OF  10  METERS.  REFER  ALSO 
TO  SAFE  DISTANCES  FROM 
POWER  LINES  AS  DESCRIBED 
IN 

SECTION 

(SAFETY 

PRECAUTIONS).

9.  Slowly operate the light bar tilt 

hydraulic lever and hydraulic 
controls enable switch to move the 
light bar forward, up and away from 
the front of the tow hitch. 

10. Operate the lift control lever and 

hydraulic controls enable switch to 
continue to raise the mast to full 
elevation.

11. Operate the telescope lever and 

hydraulic controls enable switch to 
extend the mast to desired height. 

12. Finally, adjust the light bar tilt to the 

desired angle by operating the tilt 
control lever and hydraulic controls 
enable switch. 

TO AVOID CRUSHING INJURY KEEP 
HANDS  AND  ARMS  AWAY  FROM 
MOVING PARTS OF THE MAST. 

Turning Lights On 

13. Start the engine by switching on the 

ignition switch, turning the key anti 
clockwise to the Glow Preheat 
position for 10 seconds and then 
turn to the right to start the Engine. 

Once started, allow the engine to 
warm for a minute prior to using. 

14. Switch on main circuit breaker to 

switch on the lights. 

15. Allow lights to warm up and reach 

full brightness (about 3 minutes). 

NOTE:

The lamps used are a Metal 

Halide  Gas  Discharge  type.  If  they 
are switched off and back on again 
after  they  have  been  running  they 
may  take  up  to  15  minutes  to  re-
ignite. This is normal for this type of 
lamp.

Page 1-9 

Summary of Contents for 4108AN

Page 1: ...Operation and Safety Manual Models 4108AN 1730895 August 06 2018 ISO 9001Lic 6080...

Page 2: ...also available to easily identify the component parts required for service and maintenance purposes Take time to read this book thoroughly If you are uncertain about any of the information presented c...

Page 3: ...9111 JLG Industries New Zealand 2b Fisher Crescent Mt Wellington Auckland New Zealand Phone 64 9276 1728 JLG Industries SA 8 Nucera Court Greenfields Adelaide SA 5107 Phone 08 82598777 JLG Industries...

Page 4: ...General 1 1 Safety alert symbols 1 2 Safety precautions 1 3 Preparation for use 1 5 Delivery and periodic inspection 1 5 Controls identification 1 6 Machine set up pack up instructions 1 8 Forkliftin...

Page 5: ...be followed to ensure that the machine is safe to operate The user operator of the machine shall not accept operating responsibility until this manual has been read and operation of the machine under...

Page 6: ...IDED WILL RESULT IN SERIOUS INJURY OR DEATH THIS DECAL WILL HAVE A RED BACKGROUND INDICATES A POTENTIALLY HAZARDOUS SITUATION IF NOT AVOIDED COULD RESULT IN SERIOUS INJURY OR DEATH THIS DECAL WILL HAV...

Page 7: ...the forklift or crane is of suitable e lift capacity prior to attempting th Refer to the diagrams shown elsewhere in this manual for correct handling procedures using a crane and forklift Prior to ere...

Page 8: ...be used for the specific purpose for which it was designed The Hydraulically operated mast has hazardous crushing pinch points Do NOT put arms hands etc near the mast structure while it is in operati...

Page 9: ...nd use of this lighting tower s Ensure that machine is securely parked prior to use Barriers fences and warning signs may need to be erected to ensure awareness of the nit in operation u DELIVERY AND...

Page 10: ...ol lever Pushing forward or pulling back will raise and lower the mast respectively Speed of the raise and lower function can be controlled by pushing or pulling the lever further away from the centre...

Page 11: ...itioned between the 15 lockpin indents It will move to the nearest lockpin position and the lockpin will engage to prevent further movement Park Brake Park Brake The Park brake handle shown above acts...

Page 12: ...gger arm and lock pin into position Rotate the jack from the stowed position through 180 until the foot is just above the ground Wind the jack handle to lower the foot against the ground 6 Repeat step...

Page 13: ...ired height 12 Finally adjust the light bar tilt to the desired angle by operating the tilt control lever and hydraulic controls enable switch TO AVOID CRUSHING INJURY KEEP HANDS AND ARMS AWAY FROM MO...

Page 14: ...rior to towing The light bar tilt mechanism is hydraulically locked into place during transport Two turn buckles attached to the front of the machine provide rigid support for extended transport The t...

Page 15: ...pick up the tine support bar located across the main frame of the unit Tine penetration should be at least 800mm from the rear wall of the light tower CRANING MACHINE Craning Procedure USE ONLY THE 4...

Page 16: ...the mast correctly stowed and access doors closed Retract and stow the three rear outriggers Ensure the extendable tow bar is extended and locked Ensure that the transport leg is pinned in the up posi...

Reviews: