SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-8
– JLG Lift –
3121261
Boom Control System Check Procedure
Perform the following check with no load (personnel or material)
in the platform from the ground control station.
1.
Extend all axles fully.
2.
With the boom fully retracted, raise the boom off the boom
rest to horizontal.
3.
Position the jib horizontal and fully retracted, jib straight and
locked, and platform level.
4.
Extend the boom until it stops.
5.
Boom must stop on colored stripe matching the capacity
indicator. If the boom does not stop on the correct stripe,
the system must be repaired by JLG authorized Service Per-
sonnel before the machine can be used.
6.
Push and hold the gray Boom Control System Test Button on
the ground control panel. The lighting of the green Boom
Control System Calibrated indicator indicates the system is
functioning properly. No indicator light or the lighting of the
red Boom Control System Warning indicator indicates the
system must be repaired by JLG authorized Service Person-
nel before the machine can be used.
Summary of Contents for 1500SJ
Page 2: ......
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 JLG Lift 3121261 NOTES ...
Page 68: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 JLG Lift 3121261 NOTES ...
Page 100: ...SECTION 4 MACHINE OPERATION 4 32 JLG Lift 3121261 NOTES ...
Page 143: ...SECTION 5 LCD DISPLAY PANEL GENERATION 1 2 3121261 JLG Lift 5 43 Figure 5 29 BCS Lamp Screen ...
Page 149: ...SECTION 5 LCD DISPLAY PANEL GENERATION 1 2 3121261 JLG Lift 5 49 Figure 5 34 Swing DTC Screen ...
Page 166: ...SECTION 6 EMERGENCY PROCEDURES 6 4 JLG Lift 3121261 NOTES ...
Page 180: ...SECTION 7 ACCESSORIES 7 14 JLG Lift 3121261 NOTES ...
Page 208: ...SECTION 8 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 8 28 JLG Lift 3121261 NOTES ...
Page 212: ......
Page 213: ......