Installation of cross beam through long side four
pressure blocks
Installation of cross beam through short side
four pressure blocks
Static load
(
Test load
)
Installation Method
Module Type
Installation of
long side four
pressing blocks
embedded in
beam
Installation of
cross beam
through long side
with 400 spacing
four pressure
blocks
Installation of
cross beam
through long side
four pressure
blocks
Installation of
cross beam
through short side
four pressure
blocks
JNMM144-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa
+1800Pa/-1400Pa
JNMM120-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa
+2000Pa/-2000Pa
JNBM144-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa +2000Pa/-1200Pa
JNBM120-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa +2000Pa/-1200Pa
JNHM144-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa +2000Pa/-1200Pa
JNHM120-XXX
+5400Pa/-2400Pa +2400Pa/-2400Pa +5400Pa/-2400Pa +2000Pa/-1200Pa
Table 9
3
)
182 Module
Fixture fixed installation method
Installation of cross beam through long side four pressure blocks
Static load
(
Test load
)
Installation Method
Module Type
Installation of cross beam through long side
four pressure blocks
JNMM108-XXX
+5400Pa/-2400Pa
JNMM144-XXX
+5400Pa/-2400Pa
JNBM144-XXX
+5400Pa/-2400Pa
Table 10