16
h) Fit the curve of the cyclone (8) and place the cyclone
(9).
8
9
4.5- Machine levelling and positioning
The machine must be installed on even, leveled as
rigid ground to a good performance.
To end the job, fit the four dumper rubbers (9) under the
support (5), on the points indicated on picture.
5
9
5
9
Summary of Contents for 5D
Page 2: ......
Page 32: ...32 9 Adhesives found on the machine...
Page 36: ...36...
Page 37: ......
Page 68: ...32 9 Adhesivos encontrados en la m quina...
Page 72: ...36...
Page 73: ......
Page 75: ......