26
Operation Technical Manual
A
A
B
C
INSTALLING THE HEAD FASTENERS
1.
Insert the two fasteners (A) into the holes
indicated in the figure on the side.
2.
Secure the fasteners with the nuts (B) and
washers (C) (figure on the side).
B
=
hex nut 7/16” with nylon lock (02 un)
C
= flat washer Ø12 x Ø29 x 4.76 (02 un)
NOTE!
The screws, nuts and washers are located in the
kit supplied with the head.
Summary of Contents for 1000 AT
Page 2: ......
Page 39: ...JF 1000 AT 39 TABLA DE TORQUE PARA TORNILLO ROSCA MÉTRICA Unidad de torque N m ...
Page 40: ...40 Manual de Instrucciones TABLA DE TORQUE PARA TORNILLO ROSCA PULGADA Unidad de torque N m ...
Page 41: ...JF 1000 AT 41 TABLA DE MEDIDA DE LLAVES ...
Page 42: ...42 Manual de Instrucciones ...
Page 44: ...44 Manual de Instrucciones ...
Page 45: ...JF 1000 AT 45 ...
Page 83: ...JF 1000 AT 39 TORQUE CHART FOR METRIC THREAD SCREW Torque unit N m ...
Page 84: ...40 Operation Technical Manual TORQUE CHART FOR INCH THREAD SCREW Torque unit N m ...
Page 85: ...JF 1000 AT 41 KEY GAUGE TABLE ...
Page 86: ...42 Operation Technical Manual ...
Page 88: ...44 Operation Technical Manual ...
Page 89: ...JF 1000 AT 45 ...
Page 91: ......