22
Operation Technical Manual
R
R
T
P
P
S
S
R
P
P
10.
The figure on the side shows the bearing (R)
with the major shaft mounted.
11.
Assemble the bearing assembly (R) in the
machine gathering platform. Secure with the
4 bolts (P)
12.
If the harvester is equipped with auxiliary
roller (T), remove it together with the two
supports (S)..
Summary of Contents for 1000 AT
Page 2: ......
Page 39: ...JF 1000 AT 39 TABLA DE TORQUE PARA TORNILLO ROSCA MÉTRICA Unidad de torque N m ...
Page 40: ...40 Manual de Instrucciones TABLA DE TORQUE PARA TORNILLO ROSCA PULGADA Unidad de torque N m ...
Page 41: ...JF 1000 AT 41 TABLA DE MEDIDA DE LLAVES ...
Page 42: ...42 Manual de Instrucciones ...
Page 44: ...44 Manual de Instrucciones ...
Page 45: ...JF 1000 AT 45 ...
Page 83: ...JF 1000 AT 39 TORQUE CHART FOR METRIC THREAD SCREW Torque unit N m ...
Page 84: ...40 Operation Technical Manual TORQUE CHART FOR INCH THREAD SCREW Torque unit N m ...
Page 85: ...JF 1000 AT 41 KEY GAUGE TABLE ...
Page 86: ...42 Operation Technical Manual ...
Page 88: ...44 Operation Technical Manual ...
Page 89: ...JF 1000 AT 45 ...
Page 91: ......