
16
Operation Technical Manual
B
A
C
A
C
To fit the separately purchased JF 1000-AT in a
JF 92 Z4 / Z6 / Z10, JF C40, JF C60 or JF C-120
harvester, some adjustments will be required on
your harvester:
Remove the aligners, bender and fairing* from
the harvester.
Replace the crown shaft of the gathering platform
by the longer shaft that follows with the head.
Install the cover on the bottom of the head
gathering platform.
The instructions for the above adjustments are
described below.
*On models equipped with fairing.
PREPARATION
NOTE!
The longer shaft, housing bottom cover and
fasteners are supplied along with the JF 1000-AT
Head.
The procedure is the same for JF harvesters with
belt drive or cardan shaft.
1.
Remove the bender (A).
2.
Remove the fairing (B)*.
3.
Remove the 2 aligners (C).
*On models equipped with fairing.
REMOVAL OF ALIGNERS
Summary of Contents for 1000 AT
Page 2: ......
Page 39: ...JF 1000 AT 39 TABLA DE TORQUE PARA TORNILLO ROSCA MÉTRICA Unidad de torque N m ...
Page 40: ...40 Manual de Instrucciones TABLA DE TORQUE PARA TORNILLO ROSCA PULGADA Unidad de torque N m ...
Page 41: ...JF 1000 AT 41 TABLA DE MEDIDA DE LLAVES ...
Page 42: ...42 Manual de Instrucciones ...
Page 44: ...44 Manual de Instrucciones ...
Page 45: ...JF 1000 AT 45 ...
Page 83: ...JF 1000 AT 39 TORQUE CHART FOR METRIC THREAD SCREW Torque unit N m ...
Page 84: ...40 Operation Technical Manual TORQUE CHART FOR INCH THREAD SCREW Torque unit N m ...
Page 85: ...JF 1000 AT 41 KEY GAUGE TABLE ...
Page 86: ...42 Operation Technical Manual ...
Page 88: ...44 Operation Technical Manual ...
Page 89: ...JF 1000 AT 45 ...
Page 91: ......